Cooling Demand (kW)
MT
LT
Plug-in / Integral Air R290 TEC (kWh/24h)
MT
LT
As part of main system? i
Evaporation temp. (°C)
MT
LT
Gas Cooler Installation
gCO2e/kWh emissions
System Technology COP Total annual consumption (MWh/yr) Annual energy costs(€/yr) CO₂ Emissions (kgCO₂/yr) Cost Savings (€/yr) CO₂ Savings (kgCO₂/yr) +% efficiency PBT (year) Subcooling power (kW)
TSC 2,74 496,5 99.307 € 198.615 - - - - -
FTE 3.0 3,11 437,5 87.492 € 174.983 11.816 € 23.632 11,90 % < 1 year -
TSC Scroll Not Available - - - - - - - -
2xETE 2,92 467,1 93.421 € 186.842 5.887 € 11.773 5,93 % < 2 years -
FTE - 2xETE 3,29 413,7 82.747 € 165.494 16.560 € 33.121 16,68 % < 1 year -
MCU Not Available - - - - - - - -

Disclaimer: the results and data displayed on this wizard are generate through simulation models based on predefined reference annual ambient temperature profiles and configuration of cabinets and cold rooms. These simulations are intended solely for illustrative and informational purposes; actual results may vary depending on the specific projects and location.