Cooling Demand (kW)
MT
LT
Plug-in / Integral Air R290 TEC (kWh/24h)
MT
LT
As part of main system? i
Evaporation temp. (Β°C)
MT
LT
Gas Cooler Installation
gCO2e/kWh emissions
System Technology COP Total annual consumption (MWh/yr) Annual energy costs(€/yr) COβ‚‚ Emissions (kgCOβ‚‚/yr) Cost Savings (€/yr) COβ‚‚ Savings (kgCOβ‚‚/yr) +% efficiency PBT (year) Subcooling power (kW)
TSC 1,78 887,3 177.457 € 354.914 - - - - -
FTE 3.0 1,99 791,8 158.368 € 316.737 19.088 € 38.177 10,76 % < 1 year -
2xETE 2,03 777,9 155.587 € 311.174 21.870 € 43.740 12,32 % < 1 year -
FTE - 2xETE 2,24 704,9 140.982 € 281.964 36.475 € 72.949 20,55 % < 1 year -
Glycol R290 Not Available - - - - - - - -
Waterloop R290 Not Available - - - - - - - -
2xETE + Subcooler 2,17 727,3 145.459 € 290.918 31.998 € 63.996 18,03 % < 1 year 66
MCU Not Available - - - - - - - -

Disclaimer: the results and data displayed on this wizard are generate through simulation models based on predefined reference annual ambient temperature profiles and configuration of cabinets and cold rooms. These simulations are intended solely for illustrative and informational purposes; actual results may vary depending on the specific projects and location.