Cooling Demand (kW)
MT
LT
Plug-in / Integral Air R290 TEC (kWh/24h)
MT
LT
As part of main system? i
Evaporation temp. (Β°C)
MT
LT
Gas Cooler Installation
gCO2e/kWh emissions
System Technology COP Total annual consumption (MWh/yr) Annual energy costs(€/yr) COβ‚‚ Emissions (kgCOβ‚‚/yr) Cost Savings (€/yr) COβ‚‚ Savings (kgCOβ‚‚/yr) +% efficiency PBT (year) Subcooling power (kW)
TSC 1,77 636,8 127.355 € 254.711 - - - - -
FTE 3.0 1,98 568,5 113.693 € 227.385 13.663 € 27.325 10,73 % < 1 year -
2xETE 2,01 558,5 111.705 € 223.409 15.651 € 31.301 12,29 % < 1 year -
FTE - 2xETE 2,22 506,2 101.245 € 202.490 26.110 € 52.221 20,50 % < 1 year -
Glycol R290 Not Available - - - - - - - -
Waterloop R290 Not Available - - - - - - - -
2xETE + Subcooler 2,15 522,4 104.483 € 208.966 22.872 € 45.744 17,96 % < 1 year 49
MCU Not Available - - - - - - - -

Disclaimer: the results and data displayed on this wizard are generate through simulation models based on predefined reference annual ambient temperature profiles and configuration of cabinets and cold rooms. These simulations are intended solely for illustrative and informational purposes; actual results may vary depending on the specific projects and location.